32026R0715#art_134Regulation (EU) 2026/715 of the European Parliament and of the Council

Article 134 — Parallel actions on the basis of EU designs and national design rights

1. Where actions for infringement or for threatened infringement involving the same cause of action and between the same parties are brought before the courts of different Member States, one seized on the basis of an EU design and the other seized on the basis of a national design right providing simultaneous protection, the court other than the court first seized shall of its own motion decline jurisdiction in favour of that court. The court which would be required to decline jurisdiction may stay its proceedings if the jurisdiction of the other court is contested. 2. The EU design court hearing an action for infringement or threatened infringement on the basis of an EU design shall reject the action if a final judgment on the merits has been given on the same cause of action and between the same parties on the basis of a design right providing simultaneous protection. 3. The court hearing an action for infringement or for threatened infringement on the basis of a national design right shall reject the action if a final judgment on the merits has been given on the same cause of action and between the same parties on the basis of an EU design providing simultaneous protection. 4. Paragraphs 1, 2 and 3 shall not apply in respect of provisional measures, including protective measures.

Text as published in the Official Journal, reproduced verbatim (including any typographical quirks of the source). For the authentic version, see EUR-Lex.